an image of project artemis 91

Artemis 91

Managed by PeriUrja

100% Reserved

Credits Generated

₹0

Energy Produced

0 kWh

some image in a carousel

Secured Generation is enabled for this project.  Learn More

About the Project

Artemis•91 is our fourth project in collaboration with PeriUrja. Located in Navi Mumbai, this plant is installed on the rooftops of Silver Star, this plant uses mono crystalline PERC modules from Premier Energies and is connected to MSEDCL power grid.

Every unit (kWh) from this project discounts ₹5.50 off your power bill

Overview

Capacity

91.56 KW

Reservation Status

100% Reserved

Operational Since

Nov 2025

Annualised Savings

11.5%

A badge with a check mark

New project coming soon!

Know more about Projects

Why do factors such as tenure or credit rate differ between projects?
Do I need to be in the same location as the project to reserve from it?
How much solar can I reserve?
How long can I reserve solar for?
What is the validity of my credits?
Are my monthly credits constant?

Got questions? Check our Gemini guide

BETA

A cleaner grid for our future, built together by all of us