an image of project artemis 91

Artemis 91

Managed by Periurja

some image in a carousel

Secured Generation is enabled for this project.  Learn More

About the Project

Artemis•91 is our fourth project in collaboration with PeriUrja. Located in Navi Mumbai, this plant is installed on the rooftops a cooperative housing society, Silver Star CHS. This plant uses mono crystalline PERC modules from WAAREE NON-DCR modules and is connected to MSEDCL power grid.

Every unit (kWh) from this project discounts ₹5.50 off your power bill

Overview

Capacity

91.56 KW

Reservation Status

15% Reserved

Operational Validity

Nov 2040

Annualised Savings

11.5%

Reserve Solar Now

Timeline

Host IdentificationSep 2024

Host signs up for power via PeriUrja.

Project CommissioningMay 2025

Project installed and commissioned on host premise.

View Project Details
Integrated with SundayGridsNov 2025

Project opened up for Digital Solar access

Learn about Operator-Managed Projects
Project Open for ReservationNov 2025

This digital solar project is open for reserving capacity.

View Service Contract

Project Reports

Get generation reports and other details of the project into your mailbox.

Reserve Solar Now
Reserve Solar Now

Know more about Projects

Why do factors such as tenure or credit rate differ between projects?
Do I need to be in the same location as the project to reserve from it?
How much solar can I reserve?
How long can I reserve solar for?
What is the validity of my credits?
Are my monthly credits constant?

Got questions? Check our ChatGPT guide

BETA

A cleaner grid for our future, built together by all of us