
Ace 58
Managed by PeriUrja
100% Reserved
Credits Generated
₹0
Energy Produced
0 kWh




Secured Generation is enabled for this project. Learn More
About the Project
Ace•58 is the first operator-managed project from PeriUrja, deployed on the rooftops of Gardenia CHS, Mumbai. This is an experimental release curated for existing users and those enrolled in free-access. Every unit of power generated from the plant discounts ₹9.97 per kWh off your power bill, higher than most domestic grid rates in the country. If you are new to Digital Solar, you could check with our support team if Ace•58 is a good fit for your need.
Every unit (kWh) from this project discounts ₹9.97 off your power bill
Overview
Capacity
58.29 KW
Reservation Status
100% Reserved
Operational Since
Mar 2025
Annualised Savings
11.5%

New project coming soon!

Know more about Projects
Why do factors such as tenure or
credit rate differ between projects?
Do I need to be in the same location as the project to reserve from it?
How much solar can I reserve?
How long can I reserve solar for?
What is the validity of my credits?
Are my monthly credits constant?
Got questions? Check our ChatGPT guide
BETAA cleaner grid for our future, built together by all of us
In collaboration with PeriUrja